Liviero
KwaMnyandu pedestrian bridge built by Liviero Civils
Capabilities

Operating Capabilities

Building, civils, contract mining, drill and blast, and a central plant fleet.

At its peak, Liviero operated five specialised companies backed by a central plant fleet and shared services. The record below is presented in past tense, a statement of what was delivered, and the foundation of what is now available through advisory, project-management and joint-venture arrangements.

The Quays, Durban
The Quays, Durban
est. 1983

Liviero Building

The first privately-owned building company in South Africa to achieve a CIDB 9GB grading, the highest building-grade available, conferring unlimited tendering ability. By 2018, the largest of the Group’s operating divisions by revenue.

Delivered across the full spectrum: commercial offices, industrial warehousing, hospitals and clinics, shopping centres, leisure facilities, institutional buildings, apartment complexes, design-and-build and sports stadia. More than 2,500 upper-market residential units in the latter years of operation. Awards: Supreme Builder of the Year, Commercial Building of the Year, multiple MBSA Safety Awards.

See the building gallery
Gauteng Freeway Improvement Project
Gauteng Freeway Improvement Project
est. 2005

Liviero Civils

CIDB 9CE, the highest civil-engineering grade available. Roads and earthworks, bridges, concrete reservoirs, dams, mine infrastructure, water treatment and pipelines, heavy civil structures.

As a shareholder in the Siyavaya Highway Construction Joint Venture, Liviero Civils was awarded packages A and E of SANRAL’s R4 billion Gauteng Freeway Improvement Project. Other landmark contracts included the Gautrain Rosebank and Sandton stations, FNB Stadium earthworks for the 2010 World Cup, Wesizwe Platinum Mine, and the Vedanta Gamsberg tailings storage facility, a 1.2-million-square-metre TSF in the Northern Cape.

See the civils gallery
Vanggatfontein Mine
Vanggatfontein Mine
est. 2012

Liviero Mining

Mid-tier contract miner at scale: 36 to 40 million bank cubic metres annually at peak. Specialisation in contract mining and materials handling, coal and hard rock, with a fleet selected application-specifically for productive efficiency.

Major operations: Vanggatfontein (R2.1 billion contract), Leeuwpan Colliery (R1.88 billion), Tweefontein-Makoupan, Vunene, Isibonelo and Nkomati Anthracite. Combined mining contract portfolio in excess of R5 billion.

See the mining gallery
Drill rigs on the bench, Vanggatfontein Mine
Drill rigs on the bench, Vanggatfontein Mine
est. 2014

Liviero Drill & Blast

Established to bring drilling and blasting fully in-house for Liviero Mining. At peak: two simultaneous operations, 400,000 tonnes of ROM coal per month, nine Atlas Copco 30T drill rigs, 90,000 linear drill metres monthly.

Full capability: blast design, electronic and conventional blasting solutions, seismograph and vibration control, bore-hole logging, fragmentation control, blast audits. Led by specialist practitioners with long opencast track records.

See the mining gallery
Mercedes-Benz tipper fleet
Mercedes-Benz tipper fleet
Central fleet

Liviero Plant

The Group’s central plant fleet served all three disciplines: Caterpillar, Liebherr, Mercedes-Benz, Volvo and Hitachi equipment, maintained in-house. The combination of scale, modernity and maintenance capability gave Liviero a structural cost advantage over competitors reliant on external hire. The full record follows under Plant & Equipment Heritage.

See the plant gallery
PLANT & EQUIPMENT HERITAGE

“The right tools for the job.” That was the founding principle. It did not change.

The Liviero Group built the largest privately-owned mixed plant fleet in South African construction. At peak in 2018, replacement value exceeded R2.5 billion across building, civils and mining applications.

The fleet was built on world-class brands selected for application-specific performance: Caterpillar, Liebherr, Mercedes-Benz, Volvo and Hitachi. Operator training was conducted in-house and in conjunction with OEMs; the Group ran its own operator certification programme.

The main workshop at Kyalami was built in 2006 to Mercedes-Benz dealership standards and awarded Mercedes-Benz accreditation in March 2007: six service and repair bays, a 5-tonne overhead crane, wash bay and an automated oils dispensing and removal system, all supported by a network of mobile workshops across remote sites.

The formwork and scaffolding inventory, 40,000 m² and 130,000 m² respectively, was maintained at the leading edge of formwork technology over three decades of continuous investment. The Logistics Department operated low-beds from 20 to 100 tonnes, certified for hazardous and abnormal cargo, equipped with full cab, driver, road and cargo telemetry.

FLEET VALUE AT PEAK
R2.5 billion (2018 replacement value)
WORKSHOP
Mercedes-Benz accredited, Kyalami, Johannesburg (2007)
FORMWORK
40,000 m²
SCAFFOLDING
130,000 m² access
LOGISTICS
20t, 100t low-beds, hazardous cargo certified, full telemetry
Kyalami workshop teamWorkshop engine overhaulAbnormal-load logistics

See the plant gallery

Vanggatfontein Mine from the air

Where four decades of experience would shorten the learning curve, we are available.